Versatile and results-driven Project Engineer with over 6 years of experience leading the installation,commissioning, and maintenance of complex electro-mechanical and water treatment systems. Proven expertise in managing full project lifecycles—from structural construction and GRP tank fabrication to plumbing and final commissioning of bottling and dialysis facilities. A strong technical leader adept at improving operational efficiency, reducing downtime, and building high-performing teams.
· Led the initial installation, commissioning, and setup of the entire dialysis center, including all medical, water treatment, and facility systems.
· Designed and plumbed the complete water distribution system for the facility, ensuring optimal flow and purity for medical use.
· Applied hands-on experience in constructing detachable offices and accommodation units, as well as building GRP (Glass Reinforced Plastic) tanks for raw and pure water storage.
· Maintained and calibrated a fleet of sensitive dialysis machines, achieving a 99.5% equipment uptime for critical patient care.
· Promoted to lead all technical operations following the successful erection and commissioning of the new production line.
· Managed a team of 20 operators and technicians, overseeing preventive maintenance, spare parts inventory, and continuous improvement for the entire bottling line.
· Implemented process adjustments that increased overall line efficiency (OEE) by 8% within the first year.
· Led the on-site erection, installation, and commissioning of the new bottling production line.
· Coordinated with international suppliers and managed the technical team to ensure the project was completed on schedule and within budget.
· Promoted from Operator to Senior Mechanic due to technical proficiency and problem-solving skills.
· Served as the senior technical expert for high-speed bottling production machinery, executing complex repairs that reduced machine downtime by 20%.